Measurement Canada Approval for EV Chargers

Measurement Canada type approval support for EV chargers that bill by kWh: applicability review, application preparation and coordination.

EV chargers that bill drivers by the amount of electricity delivered are measuring devices under Canadian law and need type approval from Measurement Canada. TianHeng Consulting helps EV charger manufacturers and importers prepare type approval applications and coordinate with Measurement Canada, alongside ISED certification and electrical safety approval.

When Is Approval Needed?

Electric vehicle supply equipment (EVSE) falls under the Electricity and Gas Inspection Act when it is used to bill a customer for the amount of electricity delivered during a charging session, that is, per kilowatt-hour (kWh). Chargers billed by flat fee or by charging time are not measuring electricity for trade in the same way.

Manufacturers and importers of EVSE used in measurement-based trade must apply for type approval. Charging network operators increasingly want kWh billing, so approval is becoming a condition for selling commercial chargers in Canada.

Phased Type Approval for Level 1 and Level 2 AC Chargers

  • Submitted in 2026 (Phase 2). Devices submitted between January 1 and December 31, 2026 are assessed against provisional specification PS-EVSE-02 and can receive a conditional approval.
  • Submitted from January 1, 2027 (Phase 3). Devices are assessed against the full specification S-E-EVSE-01 and can receive full approval. Additional tests, including vibration and shock, apply.
  • Conditional approvals. A notice of conditional approval carries an approval number ending in “C” and is valid until December 31, 2027 unless extended. Conditionally approved devices must be resubmitted for Phase 3 assessment no later than January 1, 2029.

Requirements for DC fast chargers (Level 3+) are still being developed through Measurement Canada consultations. Temporary dispensation programs allow certain unapproved chargers already in the field to bill by kWh under conditions for a limited period. We can help you check which rules apply to your product.

What the Application Includes

  • Type approval request form
  • Technical documentation on the design, composition and construction of the device
  • Installation and user manuals
  • The nameplate with the required markings
  • Test results showing compliance with the applicable specifications
  • For chargers with software: module and version lists, sealing and security descriptions, communication port access and the list of adjustable parameters and updatable software

Do not ship samples until Measurement Canada asks for them. Samples are normally due within 30 days of the request, and information requests usually need a reply within 7 days. Missing either deadline can lead to rejection, so preparation matters.

One Charger, Three Approvals

A networked EV charger sold in Canada usually needs ISED certification for its radio functions, electrical safety certification from an accredited certification body, and Measurement Canada approval if it bills by kWh. We can plan all three together. See EV, Charger and Automotive Electronics – ISED Certification and Electrical Safety (CSA / UL / ETL).

Our Services

  • Applicability review. Billing model, charger type and the specification phase that applies.
  • Gap review. Comparison of your test reports, nameplate and software documentation against Measurement Canada requirements.
  • Application preparation. Request form, technical file and software information.
  • Coordination. Communication with Measurement Canada, information requests and sample logistics.
  • Follow-up. Resubmission of conditional approvals for full approval, and changes to approved models.

How It Works

  1. Send us the charger specifications, billing model, manuals, nameplate and available test reports, using the form below.
  2. We confirm what applies and send you a quote.
  3. We send our service agreement. Once you sign it, we countersign and invoice a deposit. Work begins when the deposit is received, and the balance is invoiced at the milestones set out in the agreement. Government fees are quoted and paid separately.
  4. We prepare the application, submit it and handle Measurement Canada’s questions and sample requests.
  5. When the approval is issued, we help you plan any later resubmission or model changes.

Request a Quote

Contact us for a quote using the form below or email info@tianhengconsulting.com.